For NGOs & sponsors
How many kits does the flood zone actually need?
Defensible, assumption-labelled planning numbers for the six low-cost repair kits — sized to the real affected area, with every assumption in plain language so a programme officer can challenge and adjust it. Estimates, not procurement orders.
Step 1
Scope the need honestly
Nepal — recovery zone (the main ask)
North Bihar — preparedness zone (secondary ask)
Working figure: ~93,000 affected ≈ ~19,000 households (at ~5 people per household). That single number drives everything below.
Step 2
What one kit covers
Canal / kulo repair kit
1 village canal section (~40–60 households)
Static estimate: ~250–300 kits
Gravity-fed pipe & offtake kit
1 water system (~30–50 households)
Static estimate: ~300 kits
Farm restart kit
1 farming household
Static estimate: ~8,000–10,000 kits
Low-cost drainage kit
1 low-lying hamlet / ward
Static estimate: ~400 kits
Silt & bank stabilisation kit
~50 m of riverbank / farm edge
Static estimate: ~150 kits
Shared settlement toolbox
1 settlement / ward
Static estimate: ~200 kits
Step 3
Adjust the assumptions — totals update live
Use this in the meeting itself. If a sponsor says “we can fund half the need”, slide the coverage down and read the new numbers.
| Kit | One kit serves | Total need | At 100% coverage |
|---|---|---|---|
| Canal / kulo repair kit | 1 village canal section (~40–60 households) | 380 | 380 |
| Gravity-fed pipe & offtake kit | 1 water system (~30–50 households) | 428 | 428 |
| Farm restart kit | 1 farming household | 9,500 | 9,500 |
| Low-cost drainage kit | 1 low-lying hamlet / ward | 380 | 380 |
| Silt & bank stabilisation kit | ~50 m of riverbank / farm edge | 159 | 159 |
| Shared settlement toolbox | 1 settlement / ward | 212 | 212 |
| North Bihar preparedness tranche | 10% of the above, pre-positioned in 8 alert districts | — | 1,106 |
| Grand total | 12,165 |
Planning estimates only — validate against district-level assessments before any procurement. Figures reflect reporting as of 30 August 2026 and will move.
Step 4
Rough per-district split
Indicative allocation of the Nepal recovery kits by share of the damage, based on public reporting. District officials will refine this.
Rasuwa
30%Epicentre — Rasuwagadhi, Timure, Syabrubesi swept
≈ 3,318 kits at current settings
Nuwakot
30%Trishuli / Devighat corridor, displacement sites
≈ 3,318 kits at current settings
Dhading
15%Downstream surge damage
≈ 1,659 kits at current settings
Chitwan
10%Lowland flooding along Trishuli outflow
≈ 1,106 kits at current settings
Gorkha
10%Homes, schools, farmland damaged
≈ 1,106 kits at current settings
Tanahun
5%Fringe of the surge path
≈ 553 kits at current settings
Step 5
Copy-ready pitch summary
Paste this into an email or proposal. It carries its own assumptions, so it stays honest when forwarded.
Kit requirement estimate — August 2026 Nepal–Tibet flood recovery Basis: ~19,000 affected households (~93,000 people, Red Cross 28 Aug 2026), sponsor coverage 100%. - Canal / kulo repair kit: ~380 kits (1 village canal section (~40–60 households)) - Gravity-fed pipe & offtake kit: ~428 kits (1 water system (~30–50 households)) - Farm restart kit: ~9,500 kits (1 farming household) - Low-cost drainage kit: ~380 kits (1 low-lying hamlet / ward) - Silt & bank stabilisation kit: ~159 kits (~50 m of riverbank / farm edge) - Shared settlement toolbox: ~212 kits (1 settlement / ward) - North Bihar preparedness tranche: ~1,106 kits (10% of the above, pre-positioned in 8 alert districts) Planning estimates only — to be validated against district assessments before procurement. Source: himalaya-ridge-watch.app (informational only; handles no donations or payments).